Land Acquisition Process Begins In UP For 519 Km Long Gorakhpur – Siliguri Expressway

Uttar Pradesh which is domestic to several throughway tasks will get but every other parkway as the work on Gorakhpur – Siliguri Expressway has begun in the state.

The land acquisition system for the 519 km long greenfield parkway connecting Gorakhpur in Uttar Pradesh (UP) with Siliguri in West Bengal has began in the Gorakhpur and Deoria districts of UP.

Around 84 km of this four-lane limited-access highway would pass by thru UP in Gorakhpur, Deoria and Kushinagar districts earlier than entering Bihar.

It will pass by thru Gopalganj, Siwan, Chhapra, Muzaffarpur, Sitamarhi, Madhubani, Supaul, Saharsa, Purnia, and Kishanganj earlier than attaining Siliguri.

The absence of a direct road connecting Gorakhpur with Siliguri makes it nearly a day to cover the distance between the two cities. With most of it passing via northern Bihar, the proposed expressway will decrease the time and distance between Gorakhpur and Siliguri.

According to a file via Jagaran, Bhopal based LNM Infra initiatives has achieved the coaching of the Detailed Project Report (DPR).

Gorakhpur, positioned in the Northeastern section of Uttar Pradesh, is the seat of historical Goraksha peeth, which CM Yogi Adityanath presently heads. In the UP meeting elections held in 2022, CM Yogi bought elected as an MLA from Gorakhpur.

Being the seat of energy for CM Yogi Adityanath, Gorakhpur has received extraordinary attention in phrases of infrastructure development.

Besides the Gorakhpur – Siliguri Expressway planned by means of the union government, the Yogi Adityanth led country government is constructing the Gorakhpur link limited-access highway from Gorakhpur to Purvanchal Expressway and every other hyperlink avenue to join Gorakhpur with Varanasi.

Leave a Reply

Your email address will not be published. Required fields are marked *